+27 11 312 5551 info@khatocivils.com
Khato Civils (Pty) Ltd South Zambezi (Pty) Ltd Evolution Engineers (Pty) Ltd JV (KCSZEEJV) has been appointed by Water Utilities Corporation (WUC), Botswana, in July 2019 to design and construct a raw water pipeline of approximately 100km from Masama Well fields to Mmamashia Water Treatment Plant in Gaborone. The pipeline will be a combination of 1000mm and 800mm diameter, ductile iron pipe. This pipeline will augment water demands of water stressed areas within the Greater Gaborone corridor; Including Lobatse/ Barolong, Thamaga/ Moshupa/ Kanye, Molepolole, Mochudi/Bokaa Catchment areas