Latest Khato appointment (Botswana project) - Khato Civils (Pty) Ltd.

Get in touch with us
12 July 2019
Category
News
Comments 0

Design and construction of 100 km long transmission pipeline and associated works from Masana wellfield to Mmamashia water treatment plant

Khato Civils (Pty) Ltd South Zambezi (Pty) Ltd Evolution Engineers (Pty) Ltd JV (KCSZEEJV) has been appointed by Water Utilities Corporation (WUC), Botswana, in July 2019 to design and construct a raw water pipeline of approximately 100km from Masama Well fields to Mmamashia Water Treatment Plant in Gaborone.
The pipeline will be a combination of 1000mm and 800mm diameter, ductile iron pipe. This pipeline will augment water demands of water stressed areas within the Greater Gaborone corridor; Including Lobatse/ Barolong, Thamaga/ Moshupa/ Kanye, Molepolole, Mochudi/Bokaa Catchment areas

Issued by Mongezi Mnyani
Khato Civils CEO
Email: info@khatocivils.com
July 12, 2019.

Leave a Reply

Your email address will not be published. Required fields are marked *

Khato Civils (Pty) Ltd. - African renaissance project

Learn more